Site
Check & Preparation
Before commencing installation, check conditions on site.
-
All preceding works are complete and satisfactory.
- Tiling
has been allowed to set for a minimum of 48 hours.
- Dimensions
have been checked.
- Adequate
lighting and ventilation exists.
- Power
supply is available.
- Floor
and wall planes are true. If out of plumb/level, dividers, frontals
and end nibs may require trimming.
Installers
should also:
- Obtain
detailed drawings.
- Discuss
the installation with the site supervisor to resolve any problems,
which may affect installation, or expose the partitions to damage
by other trades.
|
|
| |
|
|
| |
 |
Handling & Storage |
Take
care to ensure panels are not damaged prior to and during installation.
- Handle
materials with care at all times to avoid damage and chipping.
- Ensure
materials are delivered as close as practical to the work area.
- Carry
all panels on edge.
- Store
under cover.
- Stack
panels on a flat surface and place protective material such as
foam, cardboard or plastic sheeting between panels.
|
|
| |
|
|
| |
 |
General Checklist |
 |
 |
Check
for pipes and electrical wiring before commencing installation. |
 |
DO
NOT use a hammer drill on panels. |
 |
Use
only masonry drill bits when drilling panels. |
 |
Use
a depth gauge for drilling blind holes. |
 |
Insert
all pop rivets to inner side of frontals and nibs. |
 |
To
fix partitions to wet area lining boards use toggle anchors. |
 |
Pedestal
mounted installations are more stable if abutting a fixed wall. |
 |
Cut
edges should be touched up if painted before installation. |
|
|
| |
|
|
| |
 |
Typical Toilet Partition Assembly |
|
 |
Toilet Partitions |
|
 |
Toilet Partitions Floor fixed frontals and nibs |
| Frontal
|
Fibre
cement |
2100
x 296 x 18mm |
|
| Nib
adjoining wall |
Fibre
cement |
2100
x 138mm x 18mm
(or width to suit project) |
| Nib
for end panel |
Fibre
cement |
2100
x 155mm x 18mm
(or width to suit project) |
|
| Divider
panel |
Fibre
cement |
1800
x 1500 x 18mm* |
| End
panel |
Fibre
cement |
1800
x 1500 x 18mm* |
| End
panel (optional) |
Fibre
cement |
2100
x 1500 x 18mm* |
|
| Doors
|
Fibreboard |
1800
x 600 x 18mm HMR MDF |
|
Fibreboard |
1650
x 600 x 18mm HMR MDF |
|
- For
Pedestal mounting cut height to suit height
above floor.
- Cubicles
should have a minimum width of 900mm (nom).
- Combinations
of divider panels and end panels can vary.
- Finish
is as specified.
- Hardware
is Chrome Satin finish over Brass.
*
These panels come in two piece divisions. |
|
|
|
|
| |
|
|
| |
 |
Typical Shower Partition Assembly |
|
 |
Shower Partitions |
|
 |
Shower Partitions Floor fixed frontals and nibs |
| Frontal
|
Fibre
cement |
2100
x 296 x 18mm |
|
| Nib
adjoining wall |
Fibre
cement |
2100
x 18mm x width to suit project |
| Nib
for end panel |
Fibre
cement |
2100
x 18mm x width to suit project |
| Nib
for shower seat support |
Fibre
cement |
2100
x 200mm x 18mm |
|
| Shower
seat |
Fibre
cement |
880
x 200 x 18mm |
| Divider
panel |
Fibre
cement |
1800
x 1800 x 18mm* |
| End
panel |
Fibre
cement |
1800
x 1800 x 18mm* |
| End
panel (optional) |
Fibre
cement |
2100
x 1800 x 18mm* |
|
| Doors
|
Fibreboard |
1800
x 600 x 18mm HD3 |
| |
Fibreboard |
1650
x 600 x 18mm HD3 |
|
- For
Pedestal mounting cut height to suit height
above floor.
- Cubicles
should have a minimum width of 900mm (nom).
- Combinations
of divider panels and end panels can vary.
- Finish
is as specified.
- Hardware
is Chrome Satin finish over Brass.
*
These panels come in two piece divisions. |
|
|
|
|
| |
|
|
| |
 |
Typical Guardian Washroom Partition Specification |
Supply
and install Guardian Washroom Partitions as follows: Divider panels
to be 18mm thick fibre cement, factory fabricated, and secured
 |
Shower Block |
to
back wall and frontal panels using aluminium channels. Decorative
finish to be as nominated by proprietor.
- Frontal
panels to be 18mm fibre cement factory finished and installed
with overhead channel, and fixed to floor in base channel/using
6mm brass dowels/on pedestals. Overhead channel over doors to
receive closer piece.
- Wall
nib/s to be secured to side wall/s with aluminium channel.
- All
exposed edges on frontals and nibs to be neatly arised before
painting.
-
Cubicle doors to be 18mm thick highly moisture resistant medium
density fibreboard (HMR MDF) for toilet doors, and HD3 for shower
doors.
- Door
hardware, consisting of two hinges, one slotted indicator, one
bolt and staple, one coat hook bumper, to be installed to hardware
manufacturer's instructions.
|
|
| |
|
|
| |
 |
Installing Doors and Door Hardware |
 |
Door Hardware |
- Position
indicator bolts and staple centrally, and hinges at equal distances
from top and bottom of door, so that doors can be reversed if
required.
- Hold
hinges and other door hardware in place to mark position of holes
on door and frontal.
- Drill
holes on door and frontal. A masonry drill bit is best for drilling
fibre cement material.
- Fit
hinges and door hardware.
- Fit
door to frontal.
Note: Please take care when fitting door hardware.
|
|
| |
|
|
| |
 |
Hardware |
Door
hardware is heavy-duty chrome plated brass, or stainless steel, depending
on preference. |
|
| |
|
|
| |
 |
Kits |
Standard
Guardian washroom partition kits, are supplied at short notice. Purpose
made assemblies may take a little longer. |
|
| |
|
|
| |
 |
Flexibility |
The
Guardian partition systems can be adapted to almost any washroom layout.
Purpose made partition components are available ex works if required. |
|
| |
|
|
| |
 |
Install Divider Panels |
- For
systems with numerous cubicles, only install three to four dividers
at a time.
- Locate
dividers in rear wall channels and pack to level.
- On
sloping floors trim floor-mounted panels, nibs and frontals to
suit.
- For
two-piece dividers, cut 'H' extrusion to length (allowing for
front and rear channels) and assemble.
|
|
| |
|
|
| |
 |
Install Frontals |
- If
required, trim frontals to sit flush on a sloping floor.
- Fix
bases of frontals using appropriate method ( see 'Frontal Fixing
Methods").
- Ensure
frontals are plumb and in line.
- Fix
divider in rear and front channels using a minimum of 6 pop rivets
each.
|
|
| |
|
|
| |
 |
Install Remaining Dividers, Frontals, Nibs and Doors |
- Repeat
until all dividers, frontals and nibs have been installed.
- Fit
and install doors and door hardware.
- Toilet
doors are supplied using 18mm highly moisture resistant medium
density fibreboard (HMR MDF) with HD3 for shower doors.
|
|
| |
|
|
| |
 |
Install Shower Seat Nibs and Seats |
- Mark
out shower nib position on floor and divider sidewall.
- Cut
18mm channels to length. Where nib is fixed to divider, notch
the back of the channel to clear for 'H' extrusions.
- Fix
channels to dividers or sidewalls.
- Fix
nib bases using either dowel or floor retaining channel method
only (see 'Frontal Fixing Methods'.
- Fix
nibs into nib channels using a minimum of 6 pop rivets at 300mm
centres.
- Cut,
and fix shower seat retaining channels to nib, divider/side wall
and frontal. Alternatively, use aluminium angle.
- Install
shower seats and fix on underside with pop rivets.
Guardian
Washroom Partitions easily cope with the heavy-duty treatment common
in the rugged and wet traffic washroom environment. |
|
| |
|
|
| |
 |
Dependable Application |
Guardian
washroom partitions are ideally suited for heavy duty applications,
and have proven themselves over more than twenty years in shopping
centres, office buildings, factories, sports and entertainment venues,
hotels, clubs and restaurants, educational and institutional buildings,
public and community projects, roadhouses and caravan parks. |
|
| |
|
|
| |
 |
Decorative Finishes |
A
popular, attractive and graffiti resistant paint system is available
for high use commercial and institutional washrooms, while a smooth
coating on 18mm fibre cement provides a high class yet tough finish
to the executive suite. |
|
| |
|
|
| |
 |
Vandal Resistance |
Guardian
partitions are able to cope with defacement and rough treatment common
in public washrooms. The tough fibre cement partition with an appropriate
coating is not easily damaged. However, if the need arises for re-touching,
this can easily be done. |
|
| |
|
|
| |
 |
Technical Services |
To
assist customers Guardian maintains a staff of experienced technical
consultants and design engineers. These specialists are able to advise
on design and technical matters associated with any application of
building products. |
|
| |
|
|
| |
 |
System Installation |
Guardian
can provide specialist sub-contractors for system installation. Technical
support and on-site assistance by Guardian is available. |
|
| |
|
|
| |
 |
Warranty |
The
system recommended in this manual are intended to assist those interested
in the specification and installation of Washroom Partition Systems.
The successful installation of these systems depends on numerous
factors outside the control of Guardian. However, the company will
accept responsibility for or in connection with the quality or suitability
of the system when installed in accordance with its written design
recommendations.
Guardian Building Products Pty limited ('the Company') also warrants
goods supplied and installed by the Company for a period of 1 (one)
year from date of practical completion against defects arising during
normal use and caused by defects in materials supplied by, or the
workmanship of employees of or contractors engage by, the Company
. This warranty does not cover any wilful or accidental damage caused
by others to goods installed by the Company.
If it is proven to the reasonable satisfaction of the Company that
any goods supplied by the Company or any services performed by the
Company are defective, then the Company will rectify the defect
by (at the option of the Company):
- In
the case of goods, the replacement, repair or payment for the
cost of replacement or repair of such goods; or
- In
the case of services, the supply of the services again or payment
of the cost of having the services supplied again.
The Company does not accept liability for consequential losses
or damages however they occur.
All
warranties other than those specified by the Company are hereby
excluded, and all conditions, obligations and liabilities however
arising are hereby excluded. Nothing on this warranty, however,
shall be construed as affecting any rights the buyer may have under
the Trade Practices Act or any other Commonwealth or State Legislation
which give the buyer rights which can not be modified or excluded
by agreement.
|
|

Back |
Other
Guardian Building Products
Architectual
Columns | Architectual
Column Accessories | Architectual
Profiles
Capitals
and Columns | Fibre
Cement | Hebel
ACC Powerpanel, Blocks & Wall Panels Labench
| MaxiShingle
and MaxiSlate | Polystrene
Architectual Profiles
Pipes and Accessories
| Vandal
Resistant Board | Washroom
Partitions
|
|